JVACEE is a joint venture company of Arab contractor and El-sewedy
Electric, dealing with the scope of Engineering, Procurement and
Construction of Julius Nyerere Hydropower Project in Stigler’s Gorge in
Tanzania. It is expected to produce 2,115 MW of installed Capacity. We
are looking for the below mentioned positions to be filled immediately.
Position Title: Foreman – Cables Laying 18 Posts
JOB DESCRIPTIONS:
oversees
and manages the cable laying team or individual labours to ensure that
they are performing effectively and satisfied in their role .conducts
inspections, ensures that safety procedures are being adhered to and
maintains inventory of equipments parts
Related work experience: 5_7
Overall Experience: 8-12
HOW TO APPLY
Interested candidates should channel their updated CV to [email protected]. Or visit our nearest branches at Kisaki-Morogoro or Mloka-Pwani.
The deadline for submission is 25th December 2021.