BARRICK

Tender for Reconstruction of German Road

WhatsApp
Twitter
Email
LinkedIn
Instagram

BARRICK

NORTH MARA

REQUEST FOR TENDER

Reconstruction of German Road

North Mara Gold Mine, a fully owned subsidiary of Twiga Minerals Corporation, which is ultimately owned by Barrick Gold Corporation and the Government of the United Republic of Tanzania requests the submission of Tenders from reputable, experienced, certified, and qualified parties to provide the following Earthworks and Roadworks services:

  • Preparing of identified existing borrow areas
  • Providing accommodation of traffic arrangements a6 required
  • Removal of topsoil and unsuitable material on the existing road
  • Shaping the existing road formation
  • importation of wearing course and compacting the material
  • Finishing the road reserve by the correct shaping of side drains
  • Construction of culverts, either new culvert or extension of existing

Pre-qualification Criteria

(1) At least 5-years’ experience in construction of Roads

(2) Ability to demonstrate track record and evidence references for at least 3 similar prior successful projects to the value of USD 100,000 or more

(3) Demonstration of critical skills needs such as Surveyors, Civil/Highway Engineer, Material Technician

(4) Valid Registration with Contractors Registration Board

Expression of interest

If your company meets the pre-qualification criteria and would like to be considered to receive the invitation to tender (ITT), an expression of interest (EOI) including your company profile and evidence of compliance with pre-qualification criteria may be submitted to [email protected].

Applicants must quote the reference “NM German Road” in the subject line of the email.

NB: The Company reserves the fight to invite any other supplier(s) who did not submit an EOI through this advertisement.

Key Dates

  • Last date to submit EOI                                  July 20, 2021

North Mara Gold Mine Limited

WhatsApp
Twitter
Email
LinkedIn
Instagram

Related