DEVELOPMENT OF TECHNICAL DESIGN AND TECHNICAL DOCUMENTATION (ARCHITECTURAL AND ENGINEERING DESIGNS, BILL OF QUANTITIES COST ESTIMATE AND CONSTRUCTION SCHEDULES IN THE PROPOSED MAKERE RESETTLEMENT PROCESSING CENTRE PHASE 2(M-RPC-2)
Ref: KSL/10M/238/22 Date: 24 June 2022
International Organization tor Migration (10M) Mission in Tanzania. hereinafter referred to as ‘client’ hereby invites prospective qualified proposers to submit proposals for development of technical design and technical documentation (Architectural and Engineering Designs, Bill of Quantities Cost Estimate and Construction Schedules in The proposed Makere Resettlement Processing Centre Phase 2(M-RPC-2). located at Makere in Kasulu District, Kigoma Region in accordance with the General Conditions of Contract and the Terms of Reference as set out in this Request for Proposal (RFP).
Below list of documents are valuable resources to enable you to submit your proposal:
Section 1 This Letter of Invitation
Section 2: Instruction to Proposers
Section 3; Data Sheet
Section 4: Evaluation criteria
Section 5: Terms of Reference/Statement of Works
Section 6: Contract Forms
Section 7: Proposal Forms
\f you are interested in submitting a proposal in response to this RFP. please prepare your proposal in accordance with the requirements and procedure as set oul in this RFP and submit it by the deadline for submission of proposals set out in Section 3: Data Sheet – Site visit 14 July 2022 while proposal submission deadline 27 July 2022 (1:30pm – EAT).
Request for proposal documents are also available at below sites:
1. 10M website: https: //tanzania.iom.int/do-business-us-procurement
2.10M Dar es salaam: Slipway Road. Off Chole Road Msasani Peninsula
Plot No. 1385, P. 0. Box 9270, Dar es Salaam.
3. |OM Kasulu Sub-Office: Bogwe Secondary Road – opposite Kasulu Teacher’s College,
P. 0. Box 303, Kasulu District.
We look forward to receiving your proposal.
We look forward lo receiving your proposal
Approved by:
Name: Nyararai Kwenda
Titte: Head of Sub-Office 10M Kasulu