worley

PROVISION OF LEVEL, PRESSURE AND TEMPERATURE INSTRUMENTS

WhatsApp
Twitter
Email
LinkedIn
Instagram

PROVISION OF LEVEL, PRESSURE AND TEMPERATURE INSTRUMENTS

REF-.211221-LPT

Worley Europe Limited ax EPCM Early Service Contractor for EACOP Program invites experienced and reputable Contractors to express their interest in providing Level, Temperas are and Pressure Instruments for both Uganda and Tanzania Installation the Ease African Crude Oil Pipeline EACOP) Project

The Republic of Uganda, the Uganda National Oil Company (UNOC). the United Republic of Tanzania and/or Tanzania Petroleum Development Corporation (TPDC), as well as cater

international oil companies grouching in the development of Exploration Areas 1, 1A, 2 und Kingfisher Discovery Area in the ‘Albertine Grabeo in Uganda or their affiliates will participate in the implementation of the EACOP Project (Potential Pipeline participate.

The EACOP Project development involves the engineering. construction, operation and maintenance of a crude oil export pipeline crossing Uganda and Tanzania and an onshore Marine Terminal in Chongole near Tanga Port in Tanzania.

BRIEF DESCRIPTION OF THE SCOPE OF THE MATERIALS

Tw: EACOP requirements for Level. Temperature Pressure:

Instruments shall include the supply of but not limited 41:

  • Diff. Pressure Transmitter
  • Pressure Transmitter
  • Pressure Gauge
  • Magnetic Level Gasege
  • Radar Level Transmitter
  • DP Level Transmitter
  • Temperature Guage
  • Templemore Traasmiticr with thermewell
  •   Templemore Transmitter with dual skin type clement (Clamp)

TYPE AND QUANTITY

  1. Drift Pressure Transmitter 52Qty
  2. Pressure Transmitter 497Qty
  3. Pressure Gauge 274Qty
  4. Magnetics Level Gauge 2Qty
  5. Radar Level Transmitter 110Qty
  6. DP Level Transmitter 12Qty
  7. Temperature Gauge 13Qty
  8. Temperature Transmitter with thermowell 145Qty
  9. Temperature Transmitter with dual skin type element (Clamp co ) 82Qty

The scope will include design. stoning of material manufacturing, assembly packaging, supply of drawings and data, all sub venders co-ordinplion. Factory testing, delivery FCA guarantees.

MINIMUM REQUIREMENTS:

Companies expressing their interest are invited to document their Request wills:

  • A compliments to and evidence that they have experience in developing local / atonal content value.
  • Confirmation the they run manufacture instruments a per governing international codes and standards
  • Confirmation of required SIL certification availability per project requirement
  •  An experience list for similar equipment supplied of the Upstream Oil and Gus marked in the five (51 yours.
  • A copy of their own and main supplies ISO 9001:2015 wad 140012015 & OHSAS 1800 (ISOSSOOL: 2015) current
  • Bat races from their Supply Quality Management Proved showing how material quality control implemented in to supply chain and identify what positive material identification is implemented through the manufacturing process.
  • A two (2) years look ahead shop loading charts for the facibaies intended wo manufacture, assemble and test

Interested companies which meet the minimum requirements and have the capacity to provide the goads listed above should express their interest by sending together with the above listed documents an email to [email protected] (Max. Email Size: 20 MBs & All documents must be submitted in the English language) on or before 12:00 noon London Time on 21th January 2022

Companies satisfactorily meeting the above minimum requirements will receive, subject to the signature of a Non-Disclosure Agreement (NDA) a detailed pre-qualification questionnaire for further evaluation by Company.

EACOP project reserves the right not to consider companies that submit an incomplete dossier,

Note: Only pre-qualified companies will receive an invitation to submit their bid in furtherance of the Call for Tender process.

WhatsApp
Twitter
Email
LinkedIn
Instagram

Related