Request for Expressions of Interest for the design, Fabrication, Installation and operation of a I5TPH CIL/CIP Process Plant for the Buckreef Gold Company, Katoro, Geita District, Tanzania

WhatsApp
Twitter
Email
LinkedIn
Instagram

BUCKREEF GOLD

COMPANY LIMITED

Plot 19, Mkadini Road, Oysterbay, P.O. Box 84, Dar Es Salaam,Tanzania.Te|: +255 655 015 153 Buckreef Gold Mine, P.O. Box 10953 Mwanza. Tanzania.Tel: +255 628 505 965

Request for Expressions of Interest for the design, fabrication, installation and operation of a I5TPH CIL/CIP Process Plant for the Buckreef Gold Company, Katoro, Geita District, Tanzania . .

Buckreef Gold Company Ltd, a JV agreement company between State Mining Corporation (Stamico) and Tanzam2000 Ltd, a 100% owned subsidiary of Tanzanian Gold Corporation (TSX:TNX)(NYSE MKT:TRX) hereby calls for submissions of Expressions of Interest from metallurgical engineering companies companies resident and domiciled in Tanzania and outside of Tanzania, to enter into an engineering design, fabrication, installation and operation of a I5TPH CIL/CIP process plant agreement at its flagship project site, Buckreef Gold Mine located in MnekeziVillage, Geita District,Tanzania.

Expressions of interest should be submitted by email no later than 30th November 2019 to the following: [email protected], [email protected] AND [email protected]

A detailed RFP will be emailed to potential bidders by no later than 4th December 2019 The mining contractors who would have received the RFP are then requested to submit their tender bids by no later than the 15th of December 2019 for consideration and tender selection.

BGC will select the winning Bidder no later than December 20th, 2019 following which” discussions will be initiated to finalize a Contract on a timely basis with a view to beginning mobilization to the site by no later than January’20, 2020.

“Please note that when submitting your bids, the bidders should also include full details as required and in accordance with The Mining Local Content Regulation, 20I8 and is in compliance of Part A Requirements under Regulation 18 ( I )which was submitted to the Mining Commission’s Offices, blank forms of which are available on their website”