North Mara Gold Mine Limited
REQUEST FOR TENDER PASTE FILL PLANT DETAILED DESIGN
North Mara Gold Mine, a fully owned subsidiary of Twiga Mineral Corporation, which is ultimately owned by Barrick Gold Corporation and the Government of the United Republic of Tanzania requests the submission of Tenders from reputable, experienced, certified and qualified parts to provide the following service
Detailed Engineering Design (Mechanical, Civil, Structural, instrumentation and Electrical) and Project Management Assistance that forms part of the proposed Pit Paste Fill System
Pre-qualification criteria
- At least 1o years’ experience in the project management and design of paste backfill systems in the mining industry
- Ability to demonstrate track record and evidence/ reference of the design of at least 3 actively working continuous paste backfill systems in any mine.
- Experienced key personnel to be assigned to the project.
Expression of interest
If your company meet the pre-qualification criteria and would like to be considered to receive the Invitation to tender (ITT), an expression of Interest (EOI) Including your company profile and evidence of compliance with pre-qualification criteria may be submitted to nm,[email protected].
Applicants must quote reference “NM Paste Plant Design” In the subject line of your email.
Key Dates
Last date to submit EOI March 30, 2021
North Mara Gold Mine Limited