twiga-Bariki

Requests the submission of Expressions of Interest from qualifying parties wanting to participate in the below supply of goods/services at Bulyanhulu Gold Mine

WhatsApp
Twitter
Email
LinkedIn
Instagram

Bulyanhulu Gold Mine Limited (BGML) is a fully owned subsidiary of Tonga Minerals Corporation. Bulyanhulu Gold Mine Site is located 45km south of Lake Victoria, in the Kahama District of Shinyanga Region, northern Tanzania. There are road accesses to the mine from Mwanza, 127km to the northeast and from the town of Kahama, 84km to the south.

BGML, therefore, Invites ‘Expressions of Interest’ from reputable, experienced and certified Fuel Management System
Manufacturers/Agents Interested In pre-qualifying for Inclusion in a tender process for the provision of the below goods/services

No.Reference
no.
Description of goods/services to be procuredPre-Qualification Criteria
iSUL-22-01-01Design, Manufacture, Supply and Install hardware and software for a Fuel Management System (FMS) able to manage Diesel Stock and ConsumptionEvidence of suitable HSE, OSHA compliance and site safety program Certified ISO 1400, relative to design. manufacture and installation of materials used in management and distribution of petroleum products.Traceable references of similar projects successfully executed both in scale and scope.Not less than five (8) years traceable experience with development and installation of Fuel Management systems particularly in the mining Industry with monthly consumption >2 000 000 litters of diesel fuel per month.Evidence of suitable resources availability — equipment, systems and qualified personnel (Engineers, Technician* and Installers)A written statement Indicating Tanzanian ownership percentage.Local Content plan approval letter from the Mining Commissioner or acknowledgement letter of submission Company registration documents I.e. Certificate of Incorporation, business license. TIN, VRN. Tax Clearance Certificate etc.;

The above goods are intended to be awarded through a competitive tendering process in which a restricted number of suitable pre-qualified and experienced manufactures of the above specified goods shall be invited to receive the tender documents. Please submit an “Expression of Interest” (E0I) on your company’s letterhead If your company qualify as per the pre-qualification criteria together with the following additional information and/or documentation:

  • Company profile(s) with tracked experience in design, manufacture and Installation of Fuel Management Systems;
  • Company registration documents i.e. Certificate of incorporation, business license, TIN, VRN, Tax Clearance Certificate etc.;
  • Summary of Court proceedings (pending and completed), Court Judgements and/or insolvency / bankruptcy proceedings, If any, during the last 3 years;
  • A written statement indicating Tanzanian ownership percentage, Tanzanian management and below management employment percentage to determine classification as an Indigenous Tanzanian Company as per the Local Content Regulation, 2018;
  • Applicable certification, accreditation and affiliated registrations as required;
  • Indicate the above Reference number (BUL-22-01-01) and description on your Expression of Interest submission;
  • BGML reserves the right to Invite any other supplier/s which did not submit an E01 submission;
  • Local Content plan approval letter from the Mining Commissioner or acknowledgement letter of submission

Kindly send your response by email to [email protected] latest close of business on the 07th February 2022. Any responses received after this date shall not be considered. Please quote reference number in the subject line of your email.

Pre-qualification of any company submitting an ‘Expression of Interest’ shall be at the sole discretion of Barrick-Bulyanhulu Gold Mine.

For and on behalf of BULYANHULL GOLD MINE LIMITED

WhatsApp
Twitter
Email
LinkedIn
Instagram

Related