Crude Oil Pipeline-EACOP

REQUEST FOR EXPRESSION OF INTEREST FOR THE PROVISION OF POINT TYPE
LIQUID HYDROCARBON DETECTORS – REF. 221213

WhatsApp
Twitter
Email
LinkedIn
Instagram

Worley Europe Limited as EPCM Early Services Contractor for EACOP Project invites
experienced and reputable Contractors to express their interest in providing Point Type Liquid
Hydrocarbon Detectors for the East African Crude Oil Pipeline (EACOP) Project.
The Republic of Uganda, the Uganda National Oil Company (UNOC), the United Republic of
Tanzania and/or Tanzania Petroleum Development Corporation (TPDC), as well as other
international oil companies partaking in the development of Exploration Areas 1, 1A, 2 and
Kingfisher Discovery Area in the Albertine Graben in Uganda or their affiliates will participate in
the implementation of the EACOP Project (Potential Pipeline Participants).
The EACOP Project development Involves the engineering, construction, operation and
maintenance of a crude oil export pipeline crossing Uganda and Tanzania and an onshore Marine
Terminal in Chongoleani, near Tanga Port in Tanzania.
BRIEF DESCRIPTION OF THE SCOPE OF THE MATERIALS
The Point Type Liquid Hydrocarbon Detectors shall be sensitive to only heavy liquid
hydrocarbons, generate an Intrinsically Safe 4-20mA output signal, and be supplied with
accessories for installation in pits/sumps.
The approximate number of Point Type Liquid Hydrocarbon Detectors are as follows:

The scope will include design, sourcing of material, manufacturing, assembly, packaging, supply of
drawings and data, all sub-vendors co-ordination, factory testing, delivery FCA vendor and
guarantees.
MINIMUM REQUIREMENTS:

Companies expressing their interest are invited to document their request with:
 A commitment to and evidence that they have experience in developing local / national
content value.
 Confirmation that they can manufacture Point Type Liquid Hydrocarbon Detectors as per
governing international codes and standards.
 An experience list for similar equipment supplied to the Upstream Oil and Gas market in
the last five (5) years.
 A copy of their own and main suppliers ISO 9001:2015 and 14001:2015 & OHSAS 18001
(ISO45001:2015) current certification.
 Extracts from their Supply Quality Management Procedures, showing how material quality
control is implemented in the supply chain and identify what positive material identification
is implemented through the manufacturing process.
 A two (2) years look ahead shop loading charts for the facilities intended to manufacture,
assemble and test.
Tanzania (Local Content Requirements):
 Application for registration with the EWURA Local Supplier Service Provider (LSSP)
database at the time of the response to this EOI is strongly recommended.
 Compliance with Local Content Regulations, 2017 and Local Company definition.
Interested companies which meet the minimum requirements and have the capacity to provide the
goods listed above should express their interest by sending together with the above listed
documents an email to [email protected] (Max. Email Size: 20 MBs & All
documents must be submitted in the English language) on or before 12 noon London Time, on 10thJanuary 2023].
Companies satisfactorily meeting the above minimum requirements will receive, subject to the
signature of a Non-Disclosure Agreement (NDA), a detailed pre-qualification questionnaire for
further evaluation by Company.
EACOP project reserves the right not to consider companies that submit an incomplete
dossier.

Note: Only pre-qualified companies will receive an invitation to submit their bid in furtherance of
the Call for Tender process.

WhatsApp
Twitter
Email
LinkedIn
Instagram

Related